Integrated Transport Strategy - Survey - Stage 2

December 2017 - January 2018

Integrated Transport Strategy Survey - Stage 2

In June 2017, we asked communities from Queanbeyan, Braidwood and Bungendore about their concerns and suggestions on key transport areas such as roads and freight, public transport, cycling and walking.

The feedback received and technical studies have helped inform a Draft Action Plan. The feedback that we receive will help inform the final QPRC Integrated Transport Strategy and Pedestrian Access Mobility Plans (PAMP) and Bike Plans.

The survey questions for this stage are designed to assist Council better understand your thoughts on the proposed actions detailed within this Plan and are designed to assist Council better understand your thoughts on the proposed actions detailed within this Plan.

The draft documents are available in the "Draft ITS documents" folder in the document library on the right.



Share Integrated Transport Strategy - Survey - Stage 2 on Facebook Share Integrated Transport Strategy - Survey - Stage 2 on Twitter Share Integrated Transport Strategy - Survey - Stage 2 on Linkedin Email Integrated Transport Strategy - Survey - Stage 2 link

Consultation has concluded

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>